300KGF Load 25FT Octagon Q355B Galvanized Steel Pole
$11001-499 Ton
$1000500-999 Ton
$900≥1000Ton
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Transportation: | Ocean |
Port: | Shanghai |
Select Language
$11001-499 Ton
$1000500-999 Ton
$900≥1000Ton
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Transportation: | Ocean |
Port: | Shanghai |
Model No.: 25FT
Brand: JSBS
Place Of Origin: China
Height: 25FT
Thickness: 2.5mm
Design Load: 300KGF
Type: Direct Burial
Tip Diameter: 120mm
Bottom Diameter: 152mm
Surface: Hot dip Galvanized
Material: Q355B
Selling Units | : | Ton |
Package Type | : | Sack wrap, non-woven fabric wrap |
Picture Example | : | |
Download | : |
The 25FT Steel Pole is designed and manufactured according to the standards set by the National Electrification Administration (NEA), the government agency responsible for the rural electrification program in the country.
These poles are made of Hot Dip Galvanized steel to withstand harsh weather conditions and provide stability for power lines. They are designed to support the weight of electrical cables and other equipment, ensuring safe and reliable electricity distribution across the country.
Steel Pole of National Electrification Administration
(PHILIPPINES)
Specification for Distribution Steel Pole 25FT, 30FT, 35FT, 40FT,45FT.
Height (ft) | Thickness (mm) | Butt Diameter (mm) | Top Diameter (mm) | Design Load (kg) | Yield Stress (MPA) | Zinc Coating (microns) |
25 | 2.5 | 152 | 120 | 300 | 345 | 86 |
30 | 3.0 | 226 | 127 | 500 | 345 | 86 |
35 | 3.0 | 248 | 127 | 500 | 345 | 86 |
40 | 3.0 | 317 | 127 | 500 | 345 | 86 |
45 | 4.0 | 328 | 127 | 750 | 345 | 86 |
Besides these Nea standard poles, our factory also produces 50FT-120FT Transmission poles, Steel Lighting Poles, Traffic Signal Poles, Substation Structures, Steel Crossarm, Steel Towers and other steel components.
Our factory has professional engineers to design the practical poles and save the cost for our clients.
But to design the practical poles for customers use, normally we need customer to provide us some parameter, like as following :
- Pole top design load
- Where is the position of the load (the distance from the top)
- The wind Speed
- How will the wire distribute
- Pole type with Burial Type or Base Plate type
- The connections mode , use slip joint or flange
- and others we can further more discuss when we need.
We have different packing to meet your requirement.
1. No packing, just bare poles to be delivered directly. This is the most economic way.
2. Sack wrap.
3. Non-woven fabrics wrap.
* We normally use 40FT container and our Port limit weight for 40FT container is 26 tons.
* If poles are with flange or in order to avoid any scratch while delivery, we will use 40ft open top container, which is a bit more costive than the 40FT container.
*Delivery schedule is based on your quantity. Normally within 30 working days after receiving your deposit. If large quantity, then partial delivery is allowed.
20GP Container
Size
5890 (L) * 2350 (W) * 2380 (H)
Port Limit
17.5 Tons
Packaging Details
Poles under 6M can fit in 20GP containers.
40HQ Container
Size
12000 (L) *2350 (W) * 2400 (H)
Port Limit
26 Tons
Packaging Details
Poles under 12M can fit in 40HQ containers.
40FT Open Top Container
Size
12000 (L) *2350 (W) * 2300 (H)
Port Limit
26 Tons
Packing Details
Poles under 12M with flange or in order to avoid scratch can fit in 40FT open top containers.
1. Are you a manufacturer or a trading company?
A:We are the direct factory manufacturer and the trading company.
2. Where is your company located?
A:Our factory is located in Industrial Zone No.37, Heqiao Town, Yixing District, Wuxi City, Jiangsu Province, China(mainland).
3. What are your main products?
A:Our main products are electric poles, street lighting poles, high mast pole, telecommunication tower poles, traffic signal poles, wind generation poles, etc.
4. What's your nearest port?
A: Shanghai Port is our nearest port.
5. What's your payment term?
A: Normally 30% deposit and rest by TT before shipping. Or L/C.
6. What's your delivery time?
A: Normally within 20 working days. If our factory is busy and your quantity is large, then around one month.
7. What's your price term?
A: Price Term: EXW, FOB, CFR or CIF.
EXW: Poles Cost
FOB: Pole Cost + Land Transportation + Fee on Port
CFR: Pole Cost + Land Transportation + Fee on Port + Sea Freight
CIF: Pole Cost + Land Transportation + Fee on Port + Sea Freight + Insurance.
Our factory owns advanced production lines and machines including bending calibration machine, hydraulic plate shearing machine, cutting machine, slitting machine, 208T hydraulic straightener, etc. All insure us to produce steel poles with best quality.
To ensure the quality, we have professional engineers to inspect the poles during the manufacturing and before delivery.
We have Lab Test, Workload Test, Steel thickness Test, Galvanization thickness Test, etc.
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.